





|
|
Project Experience
Project Surveillance, Inc. has a wide range of civil engineering projects underway
numbering approximately 90 different contracts. The list below is shown to give you
an idea of the broad range of civil engineering projects we can accommodate. They
vary from road and bridge construction inspections to wastewater treatment plant
construction monitoring and quality control activities.
Visit our image gallery to view project pictures.
Overview for 2011
- North Harris County Regional Water Authority
Project 7B-1 Proposed Water Line Connection to Harris County WCID 132 Water Plant

- North Harris County Regional Water Authority
Projects # 5D, 6B-3, Project 2 & 1, Project 2 & 2, Spears Road Pump Station,
Water Transmission Lines and Water Plants

- North Fort Bend Water Authority
MUD 2, MUD # 41, MUD # 119, Kingsbridge MUD, Project 1B,
Segment 1A, Segment 4A, Segment 5, Segment D-158
Water Transmission Lines and Meter Stations
- Bridgestone MUD
Widening of structural support for the Detention Pond
Comprehensive inspection duties for all district projects
- Chambers County Improvement District # 1
Cedar Crossing Barge Dock Extension – extend sheet piling wall
Bury & Partners Engineering Solutions
- City of Pasadena Public Works Department
Main Street from Southmore to SH 225
Reconstruction of Storm Drainage and Pavement
Improvements for the City of Pasadena
- City of Pearland
Alice Street Water Plant
Construction of a new 5.0 MGD above ground Water Tank,
Pump and other necessary facilities for water distribution to Pearland residents
30” water Transmission line
Installation of a new 30” waterline from Alice Street Water Plant to
Sam Houston Toll Road in City of Pearland
LJA Engineering / City of Pearland
- Galveston Mobility Project
Caroline Street Road Improvements
Replacement of Asphalt Road with Concrete Pavement, and replacement of storm sewer
Shelmark Engineering
9th Avenue Reconstruction Project
From 14th Street to Bay Street
Replacement of Asphalt Pavement with Concrete, waterline
replacement
Halff & Associates
- Algoa Friendswood Project
From State Highway 6 to FM 517
Replacement of Asphalt Pavement with Concrete pavement
Bury & Partners Engineering Solutions
- Bolivar Peninsula Road Repair
Segments 1, 2, 3, & 4
Overlay public streets with Asphalt Pavement
Amani Engineering, Huitt-Zollars Engineering, Binkley &
Barfield Consulting Engineers & Charles Gooden Consulting
- Galveston MUD # 66, Medical Plaza, Phase 2
Installation of new underground infrastructure including utilities and paving
Sherrington Engineering, Inc.
- Parkway Utility District Emergency Generators
Construction of concrete pads and installation of generators
for extreme events for six surrounding Lift Stations
Sherrington Engineering, Inc.
- Parkway Utility District Emergency Generators
Construction of concrete pads and installation of generators
for extreme events for six surrounding Lift Stations
Sherrington Engineering, Inc.
- San Leon Drainage Improvement, Galveston County
Drainage Improvements in Galveston County
Costello, Inc.
Overview for 2010
- North Harris County Regional Water Authority
Projects # 5D, 6B-3, Project 2 & 1, Project 2 & 2, Spears Road
Pump Station, 7C-1, 7C-6, 14A, 7C-4, Contracts 1, 2 & 3
Water Transmission Lines and Water Plants
Water Transmission Lines and Water Plants
- North Fort Bend Water Authority
Project 0, Project 1A
Water Transmission Lines and Meter Stations
- Bridgestone MUD
Drainage and waterline construction, infrastructure rehab
- Spring West WWTP - 0.762 MGD WWTP
Construction of New Sewer Plant
Bury & Partners Engineering Solutions
- City of Houston Public Works and Engineering Dept.
Hayes Road Reconstruction from Westheimer to Briar Forest
Extend a 2-lane road to become 4-lane road with road
re-pavement and underground storm sewer replacement
The City of Houston
- City of Pasadena Public Works Department
Fairmont Parkway – Reconstruction of storm sewer, new pavement
Golden Acres WWTP – wastewater rehabilitation plant
- Galveston MUD # 66, Medical Plaza, Phase 1
Installation of new underground infrastructure including utilities and paving
Sherrington Engineering, Inc.
- Houston Rapid Transit
North Corridor Project
Extend the existing Red Line by approximately 5.3 miles.
The new route would run from The University of Houston –
Downtown station, north on North Main to Boundary Street,
crosses east to Fulton Street, and proceeds north on Fulton to
the Northline Transit Center and Houston Community College,
the Northline Transit Center and Houston Community College,
Northline Mall Center.
GUNDA Corporation
Overview for 2009
- North Harris County Regional Water Authority
Projects # 5D, 6B-2, 6B-3, 7C4-1, 7C4-2, 14A, 17-2,
17-3, 17-4
Water Transmission Lines and Water Wells
- North Harris County Regional Water Authority
Spear Road Pump Station
Spear Road Water Plant
- Chambers County Improvements, District # 1
16" Waterline, 6" Force Main
Bury+Partners-Hou, Inc.
- Hayes Road Reconstruction
Westheimer to Briar Forest
City of Houston
- Pasadena Blvd. PHASE III
East of Burke Rd. to Red Bluff
Strawberry Rd from Spencer Highway to Vista Rd.
City of Pasadena
- State Highway 646/Toll Road Project
Entrance and exit expansion
Dannenbaum/HCTRA
- Harris County Toll Road Authority
Contract # 312
Extension of main lanes and entrance/exit ramps
Fallbrook to North of Gessner
R. G. Miller Engineering Services/HCTRA
Overview for 2008
- Cambridge Bridge
Major Bridge Paving Project
City of Houston
- West Little York Improvements Project
North Shepard to Wheatley
City of Houston
- Spring Green Extension
Storm sewer installation
Turner, Collie & Braden
- Harris County Toll Road Authority
Contract # 311
Toll Road Renovations
Harris County Toll Road Authority
Overview for 2007
- Pasadena Blvd. PHASE II
Strawberry Road to E. of Burke and E. of Burke to Pansy
City Of Pasadena
- Chambers County Improvements, District # 1
16" Waterline, 6" Force Main
Bury+Partners-Hou, Inc.
- Water Plant Expansion and Detention Pond
Harris County MUD # 144
Eby Engineers
- Park Improvements
Harris County MUD # 286
Eby Engineers
- Harbour Walk Sheet Piling
Shellmark Engineering
- 750,000. GPD Waste Water Treatment Plant and Water Plant # 1
Harris County MUD # 23
Sherrington Inc.
- 600,000 GPD Waste Water Treatment Plant
Harris County MUD # 284
Sherrington Inc.
- Grand Cay
Water & Sewer Facilities, Drainage & Paving
City of Texas City
- 1,000 GPM Water Well Rehab.. Water Plant # 1 and 2
Sanitary Sewer Rehab.
Harris County MUD # 168
Sherrington Inc.
- Deer Creek Waste Water Treatment, Liftstation, Water Plant
Improvements and Expansion
Harris County MUD # 24
Eby Engineers, Inc.
- Pirates Beach and Pirates Cove
Sanitary Sewer Improvements
Galveston County MUD # 29
LJA Engineering & Surveying, Inc.
- Houston Premium Outlets
Fairfield
Bury+Partners-Hou, Inc.
- Cypresswood Drive Extension
Drainage, Water and Sanitary Sewer, Paving
Harris County MUD # 358
Bury+Partners-Hou, Inc.
Overview for 2006
- North Harris County Regional Water Authority
Projects 10A and 10B (20" to 48")
Water Transmission Lines
- Hufsmith-Kohrville Road and Utilities Improvements
City of Tomball
- .825 MGD Wastewater Treatment Expansion
Harris County MUD # 238
Cobourn, Linseisen & Ratcliff
- Cypress Chase
Harris County MUD # 69
Eby Engineers
- Sam Houston Tollway Mainlane Widening and Entrance/Exit
Ramp Improvements (Contract # 311)
Othon, Inc.
- Parkway Utilities District
Extension of Water and Sanitary Facilities, Liftstation and Waterplant
Sherrington, Inc.
- Hardy Toll Road Widening
From Greens to Bammel Westfield
Washington Group
- Water Plant Expansion
West Harris County MUD # 4
Sherrington, Inc
- Spring Trace Commercial School Site
Waste Water Treatment Plant, Detention Pond
Landev Engineers
Overview for 2005
- North Harris County Regional Water Authority
Projects 5-A, 7-A, 7-B, 7-C 1,2
Water Transmission Lines and Water Wells
- Kirby Drive Extension-1.2 miles Double Blvd. / WS&D
24” Water lines, 30” Sanitary Sewer lines, Storm Water Pump Station,
Detention,
3-Span bridge
City of Pearland
- Shadow Creek Water Plant 1.5 Expansion
City of Pearland.
- Atascosita Trace, Sec. 1 - WS&D, Paving, Lift Station
Edminster, Hinshaw & Russ
- Twin Falls 30” Off-Site Sanitary Sewer Extension / Lift Station
Eby Engineers, Inc.
- Twin Falls- WS&D, Paving, Lift Station, Storm Water Pump Station & Detention
Facilities
Eby Engineers, Inc.
- 8,000’ – 24” Water Transmission Line from Beltway 8 on Lockwood East to
Harris County MUD 401/402
Landev Engineers, Inc.
- Mason Lakes, Sec. 2 -WS&D
Edminster, Hinshaw & Russ
- Lakes of Mason Park, Sec. 1- WS&D, Detention Lakes
Provident Engineers, Inc.
- Bridgewater Place, Sec. 1- WS&D
Provident Engineers, Inc.
- Cypress Chase – Detention Facilities, Mass Grading, Paving, WS&D
Eby Engineers, Inc.
- Willow Trace, Sec. 1 - Detention, Mass grading, Off-site drainage
R.G. Miller & Assoc.
Overview for 2004
- Ft. Bend Parkway (HCTRA)
Comprehensive Universal Services
- Fairwood and Vauthier Roads (Galveston County)
Klotz Associates, Inc.
- Calder Road Paving and Drainage Improvements (Galveston County)
JNS Consulting Engineers, Inc.
- North Harris County MUD # 16 WWTP Expansion
Sherrington, Inc.
- Sienna Plantation, Shadow Creek Ranch, Spring Terrace,
Northwood Estates, Tuscan Lakes, Yaupon Ranch, Village Creek, Harbor
Walk
WS&D, Paving, Detention Facilities, Lift Stations
LJA Engineering & Surveying, Inc.
- NE Harris County MUD # 5 800,000 GPD WWTP Expansion
Cobourn, Linseisen & Ratcliff, Inc.
- Cinco Ranch West-All Subdivisions, WS&D, Paving, Bridges, Lift Stations
Turner, Collie & Braden, Inc.
- HCMUD # 71 1.35 MGD WWTP Expansion
Brown & Gay Engineers, Inc.
- HC MUD # 71 Remote Water Well # 2
Brown & Gay Engineers, Inc..
- North Regional Harris County Water Authority
Projects 1-A, 1-B, 1-C, 1-C-1
Water Transmission Lines
|