Project Surveillance, Inc. has a wide range of projects underway numbering approximately 90 different contracts. The list below is shown to give you an idea of the broad range of projects we can accommodate. They vary from road and bridge construction observations to wastewater treatment plant construction monitoring and quality control activities.

Visit our image gallery to view project pictures.

Overview for 2015

  • Kroger at Baytown
    WS&D and Paving, Construction costs approximately $3 million
  • Westwood Section 4
    WS&D, Construction costs approximately $3 million
  • Shopping District Streetscape Improvements
    Dallas Street, Houston Downtown Management District Construction costs approximately $9 million
  • Paving and Drainage to serve Montgomery Rd.
    Construction costs approximately $3 million
  • City of Pasadena
    Crenshaw Water Plant Construction costs approximately $5.6 million
  • Southeast Water Purification Plant Metering Station
    Construction costs approximately $1.4 million

Overview for 2014

  • Fort Bend County MUD # 146 Expansion to 90 mgd
    Construction costs approximately $900K
  • Will Clayton Bridge over Union Pacific Railroad
    Construction costs approximately $6 million
  • Four Corners Sanitary Sewer Collection Facilities
    Construction costs approximately $11 million
  • Rio Brazos Sanitary Sewer Collection Facility
    Construction costs approximately $4 millionv
  • City of Pasadena
    Winona Street WW Lift Station and 24" Sanitary Sewer
    Construction costs approximately $1.3 millionv
  • Vista Street Trunk Sewer Rehab and Lift Station Rehab
    Construction costs approximately $2.2 million
  • Richey Road Trunk Sewer Phase 5
    Construction costs approximately $1.1 million
  • Finfrock Street Improvements
    Construction costs approximately $650K
  • Finfrock Street
    Construction costs approximately $1.7 million

Overview for 2013

  • Barry Rose WWTP
    Bar screen headworks, disc fillers, clarifier rehab
    Construction costs approximately $800K
  • Far NW WWTP
    Replacement of U.V. System, rehab sand fillers
    Construction costs approximately $800K
  • Kilgore Parkway Segments 2,3,4 & 5
    12" CRC, four lanes & esplanades, drainage and signalization from Hwy. 146 to Needlepoint Dr.
    12" CRC start Hwy 99 to past Needlepoint Dr., drainage, culverts and Signalization

Overview for 2012

  • North Fort Bend Water Authority
    Project – Segment 7A
    Proposed 16", 24" and 42" waterline from Grand Mission MUD # 1 Water Plant # 2, along
    drainage canals, Centerpoint Energy corridor & West Belfort to Harlem Road.
    Water Transmission Lines and Meter Stations
  • Galveston Outlet Mall
    Construction Costs are approximately $ 5,500,00. There is a detention pond, a
    lift station, a pump for the storm sewer and concrete and asphalt paving.
    There are also waterlines and storm and sanitary sewer lines.
    (Bury & Partners Engineering)
  • Louisiana Street Project
    Construction Costs are approximately $ 5,100,00. There projects entails paving,
    drainage, sanitary sewer and water for Louisiana street in League City
    (Cobb, Fendley Engineering)

Parks and Trails Projects / Beautification Projects:

  • Harris County MUD 179 Park Improvements
    Keystone Construction Services excavated detention pond, Installed granite and concrete trail's,
    Planted tree's and plants, Installed light's and maintenance building.
    This was a Dennis Eby Engineer job.
  • Harris County MUD 286 Hike and bike trail
    Gulf Coast Landscape Services installed about one and a half mile of granite
    trail's from Cypresswood Dr. along creek and through the wood's along Jones Rd.
    This was a Dennis Eby Engineer Job
  • Harris County MUD 286 Park Improvement on District Property
    Huff Mitchell Construction Installed asphalt trail, park workout stations along trail and play equipment for small children.
    This was a Dennis Eby Engineer job.
  • North Eldridge Parkway Beatification Project
    Appx ½ mile of concrete dιcor fencing
    Added irrigation system throughout, drip and spray.
    Concrete sidewalks, curved with HC ramps at intersections meeting TAS requirements.
    Flower beds, sodding, shrubs and trees throughout length of project including decorative lighting for users.
    Installed sidewalks along main entry road to subdivision
    Included TAS HC ramps
    Sidewalk was constructed around existing trees along site of appx 1 mile. All efforts to root prune and save trees.
  • MUD 150
    Construction of approx 1 mile granite pathway with concrete curbs along existing storm detention pond.
    Pathway constructed on side of slopes and along top of berms. Tied into existing bridge span that
    facilitated school students direct access to interior of subdivision instead of along main roadway.
    Installed park benches (steel) throughout project including waste recepticles.
    Planted appx 200 trees along pathway .

Overview for 2011

  • North Harris County Regional Water Authority
    Project 7B-1 Proposed Water Line Connection to Harris County WCID 132 Water Plant
  • North Harris County Regional Water Authority
    Projects # 5D, 6B-3, Project 2 & 1, Project 2 & 2, Spears Road Pump Station,
    Water Transmission Lines and Water Plants
  • North Fort Bend Water Authority
    MUD 2, MUD # 41, MUD # 119, Kingsbridge MUD, Project 1B,
    Segment 1A, Segment 4A, Segment 5, Segment D-158
    Water Transmission Lines and Meter Stations
  • Bridgestone MUD
    Widening of structural support for the Detention Pond
    Comprehensive inspection duties for all district projects
  • Chambers County Improvement District # 1
    Cedar Crossing Barge Dock Extension – extend sheet piling wall
    Bury & Partners Engineering Solutions
  • City of Pasadena Public Works Department
    Main Street from Southmore to SH 225
    Reconstruction of Storm Drainage and Pavement
    Improvements for the City of Pasadena
  • City of Pearland
    Alice Street Water Plant
    Construction of a new 5.0 MGD above ground Water Tank,
    Pump and other necessary facilities for water distribution to Pearland residents
    30" water Transmission line
    Installation of a new 30" waterline from Alice Street Water Plant to
    Sam Houston Toll Road in City of Pearland
    LJA Engineering / City of Pearland
  • Galveston Mobility Project
    Caroline Street Road Improvements
    Replacement of Asphalt Road with Concrete Pavement, and replacement of storm sewer
    Shelmark Engineering

    9th Avenue Reconstruction Project
    From 14th Street to Bay Street
    Replacement of Asphalt Pavement with Concrete, waterline replacement
    Halff & Associates
  • Algoa Friendswood Project
    From State Highway 6 to FM 517
    Replacement of Asphalt Pavement with Concrete pavement
    Bury & Partners Engineering Solutions
  • Bolivar Peninsula Road Repair
    Segments 1, 2, 3, & 4
    Overlay public streets with Asphalt Pavement
    Amani Engineering, Huitt-Zollars Engineering, Binkley &
    Barfield Consulting Engineers & Charles Gooden Consulting
  • Galveston MUD # 66, Medical Plaza, Phase 2
    Installation of new underground infrastructure including utilities and paving
    Sherrington Engineering, Inc.
  • Parkway Utility District Emergency Generators
    Construction of concrete pads and installation of generators
    for extreme events for six surrounding Lift Stations
    Sherrington Engineering, Inc.
  • Parkway Utility District Emergency Generators
    Construction of concrete pads and installation of generators
    for extreme events for six surrounding Lift Stations
    Sherrington Engineering, Inc.
  • San Leon Drainage Improvement, Galveston County
    Drainage Improvements in Galveston County
    Costello, Inc.

Overview for 2010

  • North Harris County Regional Water Authority
    Projects # 5D, 6B-3, Project 2 & 1, Project 2 & 2, Spears Road
    Pump Station, 7C-1, 7C-6, 14A, 7C-4, Contracts 1, 2 & 3
    Water Transmission Lines and Water Plants
    Water Transmission Lines and Water Plants
  • North Fort Bend Water Authority
    Project 0, Project 1A
    Water Transmission Lines and Meter Stations
  • Bridgestone MUD
    Drainage and waterline construction, infrastructure rehab
  • Spring West WWTP - 0.762 MGD WWTP
    Construction of New Sewer Plant
    Bury & Partners Engineering Solutions
  • City of Houston Public Works and Engineering Dept.
    Hayes Road Reconstruction from Westheimer to Briar Forest
    Extend a 2-lane road to become 4-lane road with road
    re-pavement and underground storm sewer replacement
    The City of Houston
  • City of Pasadena Public Works Department
    Fairmont Parkway – Reconstruction of storm sewer, new pavement
    Golden Acres WWTP – wastewater rehabilitation plant
  • Galveston MUD # 66, Medical Plaza, Phase 1
    Installation of new underground infrastructure including utilities and paving
    Sherrington Engineering, Inc.
  • Houston Rapid Transit
    North Corridor Project
    Extend the existing Red Line by approximately 5.3 miles.
    The new route would run from The University of Houston –
    Downtown station, north on North Main to Boundary Street,
    crosses east to Fulton Street, and proceeds north on Fulton to
    the Northline Transit Center and Houston Community College,
    the Northline Transit Center and Houston Community College,
    Northline Mall Center.
    GUNDA Corporation

Overview for 2009

  • North Harris County Regional Water Authority
    Projects # 5D, 6B-2, 6B-3, 7C4-1, 7C4-2, 14A, 17-2, 17-3, 17-4
    Water Transmission Lines and Water Wells
  • North Harris County Regional Water Authority
    Spear Road Pump Station
    Spear Road Water Plant
  • Chambers County Improvements, District # 1
    16" Waterline, 6" Force Main
    Bury+Partners-Hou, Inc.
  • Hayes Road Reconstruction
    Westheimer to Briar Forest
    City of Houston
  • Pasadena Blvd. PHASE III
    East of Burke Rd. to Red Bluff
    Strawberry Rd from Spencer Highway to Vista Rd.
    City of Pasadena
  • State Highway 646/Toll Road Project
    Entrance and exit expansion
    Dannenbaum/HCTRA
  • Harris County Toll Road Authority
    Contract # 312
    Extension of main lanes and entrance/exit ramps
    Fallbrook to North of Gessner
    R. G. Miller Engineering Services/HCTRA

Overview for 2008

  • Cambridge Bridge
    Major Bridge Paving Project
    City of Houston
  • West Little York Improvements Project
    North Shepard to Wheatley
    City of Houston
  • Spring Green Extension
    Storm sewer installation
    Turner, Collie & Braden
  • Harris County Toll Road Authority
    Contract # 311
    Toll Road Renovations
    Harris County Toll Road Authority

Overview for 2007

  • Pasadena Blvd. PHASE II
    Strawberry Road to E. of Burke and E. of Burke to Pansy
    City Of Pasadena
  • Chambers County Improvements, District # 1
    16" Waterline, 6" Force Main
    Bury+Partners-Hou, Inc.
  • Water Plant Expansion and Detention Pond
    Harris County MUD # 144
    Eby Engineers
  • Park Improvements
    Harris County MUD # 286
    Eby Engineers
  • Harbour Walk Sheet Piling
    Shellmark Engineering
  • 750,000. GPD Waste Water Treatment Plant and Water Plant # 1
    Harris County MUD # 23
    Sherrington Inc.
  • 600,000 GPD Waste Water Treatment Plant
    Harris County MUD # 284
    Sherrington Inc.
  • Grand Cay
    Water & Sewer Facilities, Drainage & Paving
    City of Texas City
  • 1,000 GPM Water Well Rehab.. Water Plant # 1 and 2
    Sanitary Sewer Rehab.
    Harris County MUD # 168
    Sherrington Inc.
  • Deer Creek Waste Water Treatment, Liftstation, Water Plant
    Improvements and Expansion
    Harris County MUD # 24
    Eby Engineers, Inc.
  • Pirates Beach and Pirates Cove
    Sanitary Sewer Improvements
    Galveston County MUD # 29
    LJA Engineering & Surveying, Inc.
  • Houston Premium Outlets
    Fairfield
    Bury+Partners-Hou, Inc.
  • Cypresswood Drive Extension
    Drainage, Water and Sanitary Sewer, Paving
    Harris County MUD # 358
    Bury+Partners-Hou, Inc.

Overview for 2006

  • North Harris County Regional Water Authority
    Projects 10A and 10B (20" to 48")
    Water Transmission Lines
  • Hufsmith-Kohrville Road and Utilities Improvements
    City of Tomball
  • .825 MGD Wastewater Treatment Expansion
    Harris County MUD # 238
    Cobourn, Linseisen & Ratcliff
  • Cypress Chase
    Harris County MUD # 69
    Eby Engineers
  • Sam Houston Tollway Mainlane Widening and Entrance/Exit
    Ramp Improvements (Contract # 311)
    Othon, Inc.
  • Parkway Utilities District
    Extension of Water and Sanitary Facilities, Liftstation and Waterplant
    Sherrington, Inc.
  • Hardy Toll Road Widening
    From Greens to Bammel Westfield
    Washington Group
  • Water Plant Expansion
    West Harris County MUD # 4
    Sherrington, Inc
  • Spring Trace Commercial School Site
    Waste Water Treatment Plant, Detention Pond
    Landev Engineers

Overview for 2005

  • North Harris County Regional Water Authority
    Projects 5-A, 7-A, 7-B, 7-C 1,2
    Water Transmission Lines and Water Wells
  • Kirby Drive Extension-1.2 miles Double Blvd. / WS&D
    24" Water lines, 30" Sanitary Sewer lines, Storm Water Pump Station,
    Detention,
    3-Span bridge
    City of Pearland
  • Shadow Creek Water Plant 1.5 Expansion
    City of Pearland.
  • Atascosita Trace, Sec. 1 - WS&D, Paving, Lift Station
    Edminster, Hinshaw & Russ
  • Twin Falls 30" Off-Site Sanitary Sewer Extension / Lift Station
    Eby Engineers, Inc.
  • Twin Falls- WS&D, Paving, Lift Station, Storm Water Pump Station & Detention
    Facilities
    Eby Engineers, Inc.
  • 8,000’ – 24" Water Transmission Line from Beltway 8 on Lockwood East to
    Harris County MUD 401/402
    Landev Engineers, Inc.
  • Mason Lakes, Sec. 2 -WS&D
    Edminster, Hinshaw & Russ
  • Lakes of Mason Park, Sec. 1- WS&D, Detention Lakes
    Provident Engineers, Inc.
  • Bridgewater Place, Sec. 1- WS&D
    Provident Engineers, Inc.
  • Cypress Chase – Detention Facilities, Mass Grading, Paving, WS&D
    Eby Engineers, Inc.
  • Willow Trace, Sec. 1 - Detention, Mass grading, Off-site drainage
    R.G. Miller & Assoc.

Overview for 2004

  • Ft. Bend Parkway (HCTRA)
    Comprehensive Universal Services
  • Fairwood and Vauthier Roads (Galveston County)
    Klotz Associates, Inc.
  • Calder Road Paving and Drainage Improvements (Galveston County)
    JNS Consulting Engineers, Inc.
  • North Harris County MUD # 16 WWTP Expansion
    Sherrington, Inc.
  • Sienna Plantation, Shadow Creek Ranch, Spring Terrace,
    Northwood Estates, Tuscan Lakes, Yaupon Ranch, Village Creek, Harbor
    Walk
    WS&D, Paving, Detention Facilities, Lift Stations
    LJA Engineering & Surveying, Inc.
  • NE Harris County MUD # 5 800,000 GPD WWTP Expansion
    Cobourn, Linseisen & Ratcliff, Inc.
  • Cinco Ranch West-All Subdivisions, WS&D, Paving, Bridges, Lift Stations
    Turner, Collie & Braden, Inc.
  • HCMUD # 71 1.35 MGD WWTP Expansion
    Brown & Gay Engineers, Inc.
  • HC MUD # 71 Remote Water Well # 2
    Brown & Gay Engineers, Inc..
  • North Regional Harris County Water Authority
    Projects 1-A, 1-B, 1-C, 1-C-1
    Water Transmission Lines